Construction & Repair Division

Admin/C&R Division provides staffing for the management and operation of the Public Works Department, along with maintenance and replacement of water distribution, sewer collection, and storm drainage system infrastructure.  Division also provides maintenance and replacement of fleet equipment for Public Works Department and other city departments. 

Fleet includes:

  • Sewer vacuum and jetting truck
  • Street sweeper
  • Wheel loader
  • Dump trucks
  • Utility trucks
  • Pick-ups
  • Sewer TV vehicle
  • Backhoes
  • Sanders
  • Road grader
  • Roller
  • Trailers
  • Generators
  • Other equipment

Operating budget for this Division is about $1,200,000 annually, with an average of $200,000 targeted annually to fleet replacement.  There are 10 full-time employees and 1/4 part-time employee equivalent providing these services.

The following are downloadable PDF's of the City of Pendleton's Standard Specifications:

Tags: